IMPORTANT NOTICE ABOUT WASTEWATER CAPACITY FEES

Prior to January 8, 2020, the wastewater fee per equivalent dwelling unit (EDU) was $2,627.16.  Effective March 24, 2020, it will return to $2,627.16 per EDU through September 30, 2020.  On October 1, 2020, the fee per EDU will be reinstated to $3,190.  Property owners can save $562.84 per EDU if the wastewater capacity fee is paid before October 1, 2020.

 

Sarasota County is in a multiyear utilities project. We began a phased construction in 2001 with the installation of central sewers. The septic system replacement program began to improve wastewater treatment for homes and businesses. About 14,000 septic tanks will be eliminated over the life of the project. 

  • The map below shows the project areas.
  • All properties within the boundaries will be assessed through a Non-ad Valorem assessment on the annual property tax when the work is completed. 

Neighborhood Roads Get Resurfaced 
When the central sewer construction is complete, the roads in each area will be resurfaced. This new surface will eliminate potholes, uneven surfaces and the "patchwork" look of existing roads. If you have any questions, contact us at 941-861-5000.

Plumbing Contractor License Look-up
Business License Look-up
Sewer Connection Process
Water Connection Process
Utility Deferred Payment Assistance Program
Office of Housing and Community Development
Early Hook-up Incentive Credit-Rebate for Phillippi Creek Septic System Replacement Program
Onsite Wastewater Treatment System Installation/Repair/Replacement Credit-Rebate for Phillippi Creek Septic System Replacement Program

 

New Connection Applications

New Sewer Connection Application
New Water Connection Application

Phillippi Creek Septic System Replacement Program map of all areas in the county effected.

Documents